This
project (BBSTW), referred to as the Works comprises two stages where
Stage 1 involves construction, testing and commissioning of a sewage
treatment plant, while Stage 2 involves the operation and maintenance
of the completed plants. The Works is designed to handle incoming
raw sewage loading of 200,000 population equivalent (P.E.).
The Works facilities and treatment process are categorised into
the following sections or plants: -
Primary Treatment
This is the first stage of treatment, where it is intended to remove
large suspended solids in the sewage.
- Main Inlet Pumping Station
1. Main inlet channel with equal flow distribution to coarse screening
facilities.
2. Raw sewage pumping station.
- Preliminary Treatment
1. Headwork inlet channel with equal flow distribution to fine
screening facilities.
2. Grit removal system with grit classifying facilities.
3. Grease removal system.
Secondary Treatment
This stage is also known as biological treatment. Biological treatment
consists of application of a controlled natural process in which
microorganisms remove soluble and colloidal organic material from
the waste and are, in turn, removed themselves.
- Activated sludge treatment in modified oxidation ditch (MOD)
tanks.
- Final clarification in clarifiers.
Sludge Treatment and Disposal
Sludge generated from the treatment plant must be treated prior
to disposal. There are three main sources of sludge in BBSTW plant
i.e. surplus activated sludge (SAS) from biological treatment, clarifier
scum and sludge collected from external areas disposed via the Integrated
Sludge Treatment (IST) Outloading Facility System. These sludge
are collected in the SAS/IST Storage Tanks.
- Sludge Thickening
- Sludge Dewatering
- Sludge Disposal
The scope of work for this project: -
- To design, configure and programming the necessary graphics
and Man-Machine-Interface (MMI) to the satisfaction of the client.
- Graphic pictorials based on the process flow diagram and electrical
single line diagram.
- Trend displays each comprising of each analogue signals.
- Guidance messages.
- Alarm list.
- Binary status list.
- To supply and install the Programmable Logic Controller (PLC),
personal computers, printers, modem, system communication cabling,
hub and etc. To supply and install field control cabling from
the field control panels to the CitectSCADA system panels. To
terminate the control cables in the field control panel and system
cabinets after carrying out loop check.
- To carry out testing and comissioning of the complete CitectSCADA
system to the satisfaction of the client.
|