2008
| Project Description | Owner / End User |
|---|---|
| Instrumentation and telemetry system for SG. Liang Water treatment plant, Brunei | Biwater/MWHC NEW ZELAND |
| Membekal, memasang, menguji terima dan mentauliah pam air mentah termasuk kerja-kerja electrical serta membina dan menyiapkan sebuah muka sauk dan kerja-kerja berkaitan di Kg. Kobat, Kuantan | JKR PAHANG |
| Instrumentation and control system for Kunak Water Supply | JURUTERA PERUDING/ CAMPO JAS |
| Scada and telemetry system for Hulu Terengganu Water Supply Scheme Stage 2 at Jerangau Water Treatment Plant Terengganu | SATU/ PZK SDN BHD |
| Instrumentation and Scada System for Muda River water scheme phase 4A package 8 Highlift pumping station Sg Dua water treatment plant | PBA/ SMHB |


