2021
| Project Description | Owner / End User |
|---|---|
| Proposed SCADA System for Bekalan Air Kundasang, Sabah | MEC Resources |
| Supply, deliver, install and configuration Kingfisher RTU for new installation and spare parts | Pengurusan Air Selangor S/B |
| Proposed Scada System for Ambang Botanic 2 | Envitech Sdn Bhd |
| Pembinaan Loji Rawatan Air Ke 2 Pitas, Sabah | Metrichem Sdn Bhd |
| Upgrading of Existing Instrumentation and SCADA System at Sg Siput WTP | Enchem Sdn Bhd |
| Projek membaikpulih Loji Rawatan Air Bukit Temoh, Daerah Batang Padang, Perak | Enchem Sdn Bhd |
| Automation of fourteen(14) nos. of key valves at selected distribution network locations for Pengurusan Air Selangor Sdn Bhd – Package 3C | Wasser Dynamics |
| The proposed extension of phase 2 Sawah Raja Water Treatment Plant and other related works (10MGD), Negeri Sembilan | Teknoserv Eng S/B |
| Supply , deliver, install, testing and commissioning of Instrumentation, PLC and SCADA Sytem for Loji Rawatan Sir Merlimau Fasa 2 dan Sistem agihan, Pakej 2 | Ranhill Water Technology Sdn Bhd |
| Instrumentation, Scada, Telemetry works, CCTV at Intake and Treatment Plant for Sultant Iskandar Water Treatment Plant, Johor | Water Engineering Technology Sdn Bhd |
| Supply & installation of Probe Meter and DN2000mm electromagnetic flowmeter | Gamuda M&E Sdn Bhd |
| Electrical & instrumentation rehabilitation works for Stage 2 Chlorine Plant for Badong Water Treatment Plant | Gamuda Water Sdn Bhd |
| Package 2A Cadangan memasang, menguji dan mentauliah paip air terawat utama bergarispusat 1800mm dan penyambungan ke siste agihan sedia ada serta kerja-kerja berkaitan (Fasa 1) | Yuta Maju Sdn Bhd |
| Package 1 Sultan Iskandar Phase 1, Johor | Water Engineering Technology Sdn Bhd |


