2017
| Project Description | Owner / End User | 
|---|---|
| Instrumentation, Telemetry and SCADA System for upgrading of Bukit Mewah, Selayang Baru, Kepong Estate and Bukit Jelutong Station | Leika Sdn Bhd | 
| SCADA System optic cable and Instrument for Catchment 2 and 3 | Genting Resorts Malaysia | 
| Upgrading of existing SCADA system at Kota Lama Kiri WTP Kuala Kangsar | Enchem Sdn Bhd | 
| Instrumentation and Scada Sysem of Proposed 30MLD capacity Pokok Sena water treatment plant at Mukim Jabi, Daerah Pokok Sena, Kedah | Sepakat Setia Perunding/ Green Dex | 
| Proposed extention of Phase 2 Sawah Raja water treament plant and other related works (10mgd), Negeri Sembilan. Pakej 1 – Cadangan membina dan menyiapkan Loji Rawatan Air Sawah Raja Fasa 2 | Pengurusan Aset Air Berhad/ Teknoserv Eng S/B | 
| Pakej 1, membina, menyiapkan dan mentauliah Loji Rawatan Air Sungai Rawa berkapasiti 40 JLH serta kerja-kerja berkaitan | Teknoserv Eng S/B | 


